Header image with 5 fiddles

2005-07-06

Final assembly

Fit saddle to curve of top. Blend in both at edges and top.

Top of saddle should be in middle. 

Journal_19.jpg

On neck scrape edges of fingerboard flush.

Ream out peg holes to fit test pegs.

Drill nut hole 1/4"
Ream to fit nut.

Assemble string holder.
String in sequence G - E - D - A

Use post setter to set post under right leg of bridge.

Tune and test!